Energy bars are portable nutritional foods with carbohydrates and proteins as core components. Originally developed in 1985 by a nutritionist for marathon runners, these bars provide rapid energy replenishment for athletes. After 40 years of development, energy bars have evolved into functional foods covering multiple scenarios including sports, meal replacement, and health management.
HANYUAN's Nuts Energy Bar Production Line is designed for industrial production of energy bars, nuts bars, and cereal bars. The system covers the complete process from melting and weighing adhesive materials to weighing dry materials, automatic mixing of dry and adhesive materials, forming, cooling, cutting, chocolate coating (full-coating or bottom-coating), decorating, and pillow inner packaging.
Complete production line capable of cooking, evaporation, concentration, and mixing of materials
Multiple feeding hoppers enable multi-layer bar production
Linear design with simple structure for easy installation and maintenance
Optional chocolate coating machine and decorating machine available
Adjustable cutting machine for producing bars of different sizes
Technical Parameters
Item
Value
Voltage
380V/50Hz
Power
120kW
Capacity
300-500kg/h
Area
30×8m
Manpower
4-6 people
Frequently Asked Questions
How To Install The Machine?
We provide comprehensive installation support through videos, emails, and pictures. For large projects, we will arrange an engineer to assist with installation in your country.
What is your equipment guarantee?
Our standard guarantee is 1 year for the peanut candy bar making process line.
What if I encounter problems while using the equipment?
Don't worry. We provide comprehensive after-sales service including video demonstrations of problem resolution and detailed written instructions. If necessary, we can arrange for a testing engineer to visit your factory.
After-sale Services
Sample Running Service: Various machine models available for sample testing to verify production line perfection
Quality Testing: Technical engineers conduct 72-hour continuous operation testing according to customer requirements
Video Training: Comprehensive library of 100+ installation and commissioning videos for permanent training support
Customer Feedback: Maintain close contact with customers to gather feedback and improve products
Warranty & Maintenance: 1-year warranty service with industry-leading lifelong maintenance concept (accessories and labor charged at actual cost after warranty period)